The Dhaka Apartment Kitchen Renovation — Realistic 2026 Cost Bands

Every Dhaka apartment kitchen renovation ends up costing more than the initial quote — not because contractors lowball, but because the buyer keeps adding items after seeing the first draft budget. This is a working line-item breakdown for a Dhaka 8×10 to 10×12 kitchen in mid-2026, split into three tiers so you can see what actually changes as the number goes up.

The three tiers, at a glance

TierRangeWhat you get
Basic refresh৳80,000–130,000Laminated MDF cabinets, tile countertop, one new appliance, existing floor
Mid-tier৳180,000–260,000Marine ply carcass with laminate/veneer doors, granite countertop, chimney + hob, sink + tap, wall-tile refresh
Premium৳350,000+Soft-close plywood cabinets, quartz or engineered stone, full appliance suite, plumbing/gas rerun, floor tile

The line items

Cabinets

A typical 8×10 kitchen has 8–10 running feet of base and 6–8 running feet of wall cabinetry. Do the math and cabinets alone vary from ৳36,000 to ৳140,000+ before hardware.

Countertop

A typical kitchen has 20–28 sq ft of countertop.

Chimney and hob

Auto-clean chimney with 1,200 m³/hr suction, branded (Hindware, Faber, Elica): ৳18,000–35,000. Locally assembled options at ৳9,000–14,000 exist but service networks are patchy.

Four-burner glass-top hob: ৳9,000–22,000 depending on brand and burner type.

Sink and tap

Single-bowl 16-gauge stainless: ৳3,500–6,000. Double-bowl 18-gauge: ৳6,500–12,000. Composite/granite sinks: ৳11,000–22,000. Mixer tap: ৳2,500–8,000 for local brands; 2–3x for imported Grohe / Kohler.

Plumbing rework

Moving sink or gas point: ৳6,000–14,000 plumber + materials. Titas gas point relocation needs an authorised technician; expect ৳3,500–7,500 plus a wait for Titas approval on paperwork if the primary connection moves.

Electrical

Extra power points near countertop (kettle, mixer, air fryer, RO purifier): ৳600–1,200 per point installed. Under-cabinet LED strip: ৳150–350 per running foot.

Tiling

Wall-tile refresh above countertop (30 sq ft typical): ৳80–250/sq ft tile + ৳200–350/sq ft labour. Floor tile replacement: ৳120–280/sq ft tile + ৳180–320/sq ft labour.

Labour and finish

Carpenter labour for cabinet install: ৳6,000–14,000. Painter: ৳3,500–6,000. Cleaning and haulage: ৳2,000–4,000.

Where quotes typically go wrong

Who to talk to

Four kinds of Dhaka vendors in 2026:

Match the vendor to the tier. A branded studio pricing a basic-tier job will still quote premium numbers because their process is expensive; a Naya Bazar carpenter tasked with premium soft-close plywood cabinets will produce mid-tier quality at premium prices.

The one line to hold in the contract

Add a “no scope increases without written approval” clause. Every kitchen renovation ends with three or four ad-hoc changes agreed verbally on site — a chimney upgrade, an extra outlet, a granite upgrade — and every one of them appears on the final bill at a mark-up. A one-line clause forces even the small changes to go through a WhatsApp confirmation, which keeps the final number within 10% of the initial quote instead of the usual 25–40%.